Pacific Coast Producers Case Study Draft

CASE STUDIES

Our Del Monte Project

This was our biggest project at a cost of $3.7 Million. It started June 2014 and was completed may 2015.

Del Monte Systems

Compu-NOx

The Only Exact and Perfect Air Fuel Ratio Combustion Control System.

CataMizer

Sub 2ppm NOx SCR with Integral High Efficiency Economizer

CondiMax

Heat Exchanger for 95%+ Efficiency

Eclipse

Natural Gas Reciprocating Engine that generates 300 Kilowatts of electricity at less than $0.04 / kw-hr while producing steam from the engines waste heat.

© Copyright 2023 - Benz Air Engineering